Planning Intelligence Flanders

How to turn a lead into a phone call

Planning registers publish names and addresses, but almost never a phone number or an email address. Here is how to bridge that gap. How long it takes depends on the country and on how common the name is - we are measuring that properly rather than guessing at it.

The registers that apply here

Flanders names a party on 23% of permits — and every single one of those carries a KBO company number. That number resolves to exactly one company in the national register, so where a name exists it is a lookup rather than a search. Every permit also links to its own file on the Omgevingsloket.

Flanders names no designer

The register here records that a designer was required, never their name — so the steps in this section help only when you already know who designed the works. The applicant route further down is the one that works in Flanders.

Or go to the developer

For things bought in bulk - kitchens, tiling, pools, finishes - the developer usually decides.

  1. Look them up in the company register. Every country here has a free public company register. It confirms you have the right company and gives the registered address and directors. The one for this country is linked above.
  2. Search for their website - company name plus country.
  3. Try the phone directory. A national business directory is still the most reliable source of a switchboard number when a practice has no website.
  4. Ask for the named person. Where we show an "ask for" name, that person is named on the application itself, so you skip reception entirely.

Go and look at the site

Planning rules require a notice displayed at the development, and it carries the architect's details. For a local supplier, driving past a shortlisted site is often the fastest route to a name and number - and it tells you whether work has actually started.

Call at the right time

This matters as much as the lead itself. Ringing about air conditioning the week a permit is granted wastes everyone's time - the building does not exist yet.

TradeCall this long after approval
Excavation & demolition0-6 months
Concrete & structural2-12 months
Stone & restoration4-14 months
Aluminium & glazing9-18 months
HVAC & ventilation12-24 months
Lifts & escalators10-22 months
Solar & renewables12-26 months
Pools & wellness14-26 months
Kitchens & joinery18-30 months
Landscaping & soft works20-32 months
Electrical10-22 months
Plumbing & drainage8-20 months

Every lead on this site shows its own call window.

What to say

You know the case reference, exactly what is being built, where, and whether it was approved. Use it.

An invented example — replace the reference and the project with those from your own lead:

"I saw 2025000000 was approved - the 161-key hotel. We supply HVAC and wanted to introduce ourselves before the services package goes out."

That is not a cold call.

A few rules

What is for sale here

In Flanders you can subscribe to: public works, commercial permits. Everything else on this site is free to browse.

Those permits open in full: what is being built, where, and the business contact where we hold one.

Try 7 days free Flanders · public works · 7 days free, no card, then €45 excl. VAT/month (e.g. €54.45 incl. VAT in Belgium; Stripe shows your exact VAT before payment) Try 7 days free Flanders · commercial permits · 7 days free, no card, then €35 excl. VAT/month (e.g. €42.35 incl. VAT in Belgium; Stripe shows your exact VAT before payment)

See what a subscription actually gives you

We will send you one email: the pages you are looking at with the names and telephone numbers left in, what every subscription costs, and where each record comes from.

One email, sent once. No list and no second message; your address is used only to send it, through our email provider.

Loading…